Share Lake Tributary Flood Studies on FacebookShare Lake Tributary Flood Studies on TwitterShare Lake Tributary Flood Studies on LinkedinEmail Lake Tributary Flood Studies link
Council adopted the draft report: Flood Studies for Eight Residual Lake Macquarie Waterway Tributary Catchments on 25 October 2021. Thank you to everyone who gave feedback.
In 2020, Council engaged specialist consultant WMAwater to undertake a Flood Study Assessment for eight urbanised waterway tributary catchments.
This study completes Council’s flood study coverage of the major catchments within the City.
The tributary catchments included in the study are:
Plains Gully Creek at Swansea and Caves Beach
Sheppards Creek at Croudace Bay and Valentine
Muraban Creek at Floraville and Belmont North
Mills Gully Creek at Belmont and Valentine
Fullers Creek and Freshwater Creek at Bonnells Bay
Mannering Creek, Swampy Creek and Wyee Creek at Wyee
Postmistress Creek at Sunshine and Morisset East
Puntei Creek at Carey Bay.
This exhibition closed 28 July 2021.
In 2020, Council engaged specialist consultant WMAwater to undertake a Flood Study Assessment for eight urbanised waterway tributary catchments.
This study completes Council’s flood study coverage of the major catchments within the City.
The tributary catchments included in the study are:
Plains Gully Creek at Swansea and Caves Beach
Sheppards Creek at Croudace Bay and Valentine
Muraban Creek at Floraville and Belmont North
Mills Gully Creek at Belmont and Valentine
Fullers Creek and Freshwater Creek at Bonnells Bay
Mannering Creek, Swampy Creek and Wyee Creek at Wyee
Open - Collecting community information (Data Collection)
Lake Tributary Flood Studies has finished this stage
This consultation is open for contributions. We're asking for information on flooding for your property or local area. Please share your flooding experiences, personal recollections, photos, videos or flood marks.
Develop the Flood Studies
Lake Tributary Flood Studies has finished this stage
The consultants will combine all of the
community information with results from flood modelling technology to develop
the flood studies.
Public Exhibition of the draft Flood Study Report
Lake Tributary Flood Studies has finished this stage
The work completed to date has been compiled into a draft Flood Study Report and placed on public exhibition for further feedback.
Implementation of the Plan
Lake Tributary Flood Studies is currently at this stage
After public exhibition of the floodplain risk management study and plan, it will be submitted to the elected Council for adoption. Once adopted, Council will implement the plan.
Photos
Fullers Creek and Freshwater Creek at Bonnells Bay flood study catchment